• Skip to main content

    Market Data

    Rig Counts Continue Free Fall

    Written by Brett Linton


    According to Baker Hughes data from April 29, 2016, the U.S rig count for the week was 420 rigs exploring for or developing oil or natural gas. This is a decrease of 11 rigs when compared to last week, with oil rigs down 11 to 332 rigs, gas rigs down 1 to 87 rigs, and miscellaneous rigs up 1 to 1 rig. Compared to this time last year, the 420 count is down 485 rigs, with oil rigs down 347, gas rigs down 135, and miscellaneous rigs down 3.

    The Canadian rig count decreased by 3 to 37 rigs this past week, with oil rigs down 2 to 10 rigs, gas rigs down 1 to 26 rigs, and miscellaneous rigs unchanged at 1 rig. Compared to last year the 37 count is a decrease of 42 rigs, with oil rigs down 7, gas rigs down 36, and miscellaneous rigs up 1. International rigs decreased by 33 to 985 rigs for the month of March, a decrease of 266 rigs from the same month one year ago. For a history of both the US and Canadian rig count, visit the Steel Market Update website here.

    Brett Linton

    Read more from Brett Linton

    Latest in Market Data

    AISI: Southern rebound lifts US steel production, again

    US raw steel production continues its broad seesaw pattern, bouncing back from the prior week’s decline, according to the latest American Iron and Steel Institute (AISI) figures. Raw steel output has fluctuated sharply since late summer, reaching an 18-year high at the end of October before returning to more typical levels the following week. Despite the wide ebb and flows of late, production has generally trended lower since seeing sustained growth through May, though it remains historically strong compared to recent years.

    Final Thoughts: Do Mesabi Metallics and Hyundai-POSCO signal more foreign steel investment in US?

    Could two new steel projects signal a new direction in the marketplace? Both Mesabi Metallics’ recently announced steel facility in Iowa and the Hyundai-POSCO’s proposed mill in Louisiana are major undertakings. You don’t spitball a major steel mill and then start producing the next day. From initial concept to site selection and on up to the first melt, there is a labyrinth of permitting, planning, and construction to navigate before the first heat.

    Lead times extend deeper into 2027, some see no availability until late Feb

    Lead times for sheet and plate products continue to extend in a US steel market still in the grip of a historic supply squeeze, according to the latest SMU steel market survey data. Average lead times now extend into late January 2027, with some mills not quoting availability until mid/late February. Lead times for all sheet products except Galvalume stand at their highest point since the post-Covid demand snapback in 2021. And plate lead times have exceeded their 2021 peak, repeatedly setting new record highs in our data series over the past month. (We started collecting plate lead time data in 2018. Our sheet lead time figures go back to 2012.)