Steel Mills

US Steel Blames Imports for Temp Idling of Gary Works Tin Line
Written by Michael Cowden
September 6, 2022
US Steel has temporarily idled the No. 5 tin line at its Gary Works in northwest Indiana.
The Pittsburgh-based steelmaker indicated that the move was necessary because of weaker demand and increased import volumes.
“The company’s other tin operations continue to operate in line with customer demand. We expect to bring number 5 tin line back online when market conditions allow,” a company spokeswoman said in an email to Steel Market Update on Tuesday, Sept. 6.
There were no job losses stemming from the idling because employees impacted by it were moved to other areas of Gary Works, she added.
Gary Works is US Steel’s largest steelmaking complex. It has raw steel capacity of 7.5 million tons per year. The plant makes hot-rolled, cold-rolled and coated sheet – including tin mill products.
Tin products are used the food and beverage container industry as well as in aerosol cans and in paint cans and pails, according to the company’s website.
As for imports, the US brought in 797,351.6 metric tons of tin plate in 2021, up 14.3% from 697,327.4 tons in 2020 and up 16.5% from 685,791.5 tons in 2019, according to Commerce Department figures.
Imported tin mill products now account for more than 60% of estimated domestic market consumption, the US Steel spokeswoman said.
“This temporary idling at Gary is proof that increases in imported steel remain a very real threat to the livelihoods of the workforce at American steel producers,” she added.
By Michael Cowden, Michael@SteelMarketUpdate.com

Michael Cowden
Read more from Michael CowdenLatest in Steel Mills

Domestic mill shipments slip in July: AISI
US steel shipments decreased month over month in July, but were up from last year, according to the latest figures from the American Iron and Steel Institute (AISI).

Nippon and USS drop litigation vs. USW and Cliffs
Another chapter of the Great U.S. Steel Buyout of the 2020s melodrama has closed, with all involved parties terminating the litigation disputes between them.

Steel Summit: Analysts say demand likely to struggle until 2027
Steel industry analysts at this year's SMU Steel Summit said they see lackluster demand through this year and next.

USS Clairton begins full production of batteries 19 and 20, 13 and 14 hot idled
U.S. Steel has activated batteries 19 and 20 at its Clairton Coke Works facility after pausing each “out of an abundance precaution” following an explosion at the site on Aug. 11.

Steel Summit: Schneider sees SDI ‘on the edge of a very good run’
Steel Dynamics Inc. (SDI) President and Chief Operating Officer, Barry Schneider, remains bullish about the Fort Wayne, Ind.-based steelmaker’s position in the current market.