Steel Mills

Algoma Board OKs Two New EAFs, Startup Set for '24
Written by Michael Cowden
November 11, 2021
The board of Canadian flat-rolled steelmaker Algoma has approved the construction of two new electric arc furnaces (EAFs) with combined steelmaking capacity of 3.7 million tons per year.
The new EAFs are expected to come online in 2024 and to replace the Sault Ste. Marie, Ontario-based company’s blast furnaces and basic oxygen furnaces.
“We believe that today’s strategic decision to transition Algoma to electric arc steelmaking represents a win for all of our stakeholders,” Algoma CEO Michael McQuade said in a statement on Thursday, Nov. 11.
“It is designed to transform Algoma into a more agile and profitable company, positioned for long-term growth as an economic driver and employer of choice in our community,” he added.
The switch to the EAF route, which will lower Algoma’s CO2 emissions by an estimated 70% (3.3 million tons per year), also depends on more electricity becoming available, the company said.
Algoma said it would in addition add new vacuum degassing capability so that it could make a wider range of plate products. The company make makes hot-rolled and cold-rolled coil as well as plate.
Lower CO2 emissions aren’t the only benefit of EAF steelmaking. Algoma expects lower conversion costs, lower carbon tax liabilities and lower maintenance spending compared to traditional integrated steelmaking.
The company also expects that the EAF route will allow it the flexibility to match production to market conditions. And having two EAFs will reduce the risk of a single furnace failing – something Algoma is currently exposed to.
Algoma has two blast furnaces: The No. 7 has daily capacity of 8,400 tons of iron. The No. 6 has capacity of 3,000 tons of iron per day but is idle, according to SMU’s blast furnace status table.
The company announced in May that it planned an IPO, proceeds of which could be used to fund its transformation to EAF production. That IPO occurred last month, and the company has since announced a joint venture with scrap recycler Triple M Metal to source prime scrap and other iron units for its EAFs.
Algoma is hardly alone in switching to the EAF route or adding new EAF capacity. New EAFs have been announced or are being considered across North America – and around the world. That has raised concerns about a potential shortage of prime scrap in coming years should supplies of the raw material fail to keep pace with a big projected increase in demand.
By Michael Cowden, Michael@SteelMarketUpdate.com

Michael Cowden
Read more from Michael CowdenLatest in Steel Mills

USS swings to loss in first quarter on N. American flat-rolled segment woes
U.S. Steel CEO praised the company’s resilience, “despite the seasonally low results driven by annual mining logistics constraints in our North American Flat-Rolled segment and lagging spot prices.”

Nucor gives updates on new capacity coming online
Nucor said several of its capital projects will start operations within the next year and provided an update on them.

Algoma swings to loss on ‘market challenges’ and ‘tariff uncertainties’
Canada’s Algoma Steel swung to a loss in the first quarter amid "market challenges," and the company now expects first steel production from its first EAF in the second quarter.

Ternium raises budget for Mexico project
The steelmaker now expects the new steel slab mill in Pesquería will begin operations by Q4’26.

SSAB announces $74M expansion in Alabama
The project will expand heat treat capacity at its Axis, Alabama plant