Steel Mills

Granite City Shift From Steel to Pig to Cost ~950 Jobs in '24: USS
Written by Michael Cowden
June 30, 2022
Approximately 950 jobs could be lost at US Steel’s Granite City Works near St. Louis once the mill stops making steel, a company spokeswoman confirmed.
The Pittsburgh-based steelmaker currently employs approximately 1,500 people at the mill. There would be an estimated 550 employees when the shift to pig iron production happens in 2024.
“There is no immediate job loss. This would not occur for two years,” she said.
US Steel announced on Tuesday that it planned to stop making steel at Granite City in the second half of 2024. That outcome is the result of a deal that would see ownership of the mill’s blast furnaces switch to SunCoke Energy Inc., which would retool them to make pig iron.
The company would then have rights for the next decade to use all of that pig iron to feed its growing number of electric arc furnaces (EAFs), notably at its Big River Steel Works in Arkansas – which is in the process of becoming a mega-mill with annual capacity of 6.3 million tons per year.
US Steel would continue to own and operate Granite City’s galvanizing and Galvalume operations. But it would shut the plant’s steelmaking operations, hot strip mill and other finishing facilities.
While the job losses won’t happen until 2024, the United Steelworkers (USW) union said US Steel’s investments in non-union facilities such as Big River would impact contract negotiations this summer.
Most of US Steel’s mills are represented by the USW. The company’s contract with the union expires on Sept. 1.
Granite City had become a posterchild among the USW and former President Donald Trump, who visited the mill, as evidence of the success of Section 232 tariffs, which the Trump administration rolled out in 2018.
Dan Simmons, president of USW Local 1899, said last year that the 25% national security tariffs resulted in the mill coming back to life after being left largely idle for nearly two and a half years. “It helped us get the door back open again,” he said.
US Steel has two furnaces at Granite City: “A” and “B.” The company announced in late March 2020, following the outbreak of the Covid-19 pandemic, that it would temporarily idle the “A” furnace. It has remained idled since.
By Michael Cowden, Michael@SteelMarketUpdate.com

Michael Cowden
Read more from Michael CowdenLatest in Steel Mills

AISI: Raw steel production backs off multi-year high
US raw steel output edged lower last week after hitting a multi-year high in mid-June, according to the American Iron and Steel Institute (AISI).

Private equity firm Atlas Holdings to acquire Evraz North America
Atlas Holdings said it has signed a definitive agreement to acquire Evraz North America (Evraz NA). The Greenwich, Conn.-based private equity firm said it expects the deal for the Chicago-based steelmaker to close in the second quarter of 2025 subject to various closing condition.

Granite City Works must remain open and other terms of the Nippon-USS deal
SEC documents also name Trump specifically as having veto power certain decisions are part of the “Golden Share” provision.

USS shuffles some leadership roles after close of Nippon deal
USS shuffles leadership deck after deal closes with Nippon.

ArcelorMittal fires up steelmaking at Calvert mill
With the marking of the EAF’s first heat earlier this month, the mill has moved from a rerolling and finishing mill to a full steelmaking facility.