• Skip to main content

    Product

    Steel Mill Lead Times: Shorter Still

    Written by Tim Triplett


    Lead times for spot orders of all types of steel products continued to shorten in the past two weeks with demand falling below the pace of steel production. The average lead time for hot rolled is now below three and a half weeks, cold rolled is nearing five weeks, galvanized is less than six weeks and Galvalume is slightly above six weeks. Lead time for steel plate has declined to nearly four and a half weeks, according to Steel Market Update data. Our graphic (shown below) tells the tale and helps to explain why there has been pressure on flat rolled and plate steel pricing.

    Lead times for steel delivery are a measure of demand at the mill level. The shorter the lead time, the lighter the order activity at the mills and the more likely they are to negotiate on price.

    Latest in Product

    SMU Survey: Steel mills’ willingness to talk price remains low

    Steel mills’ willingness to negotiate spot prices remained limited in SMU’s latest Flat-Rolled Steel Survey. The overall negotiation rate was 4%, down from 5% in the previous survey but above the 3% recorded at the end of October, which was the lowest level since July 2021 (Figure 1). Negotiation rates have trended downward all year as steel prices have moved higher. Buyers reported no mill willingness to negotiate for hot-rolled, galvanized, and Galvalume sheet. Some buyers reported opportunities to discuss prices for cold-rolled sheet and plate (Figure 2).

    SMU flat-rolled market survey results now available

    The results of the latest Steel Market Update (SMU) flat-rolled market survey are now available on our website to all premium members. After logging in, look under the Data tab for Market Reports, and there you will find the Flat-Rolled Survey Results section. Previous survey results are also available on that page. If you need help accessing these results, or if your company would like to have your voice heard in our future surveys, contact smu@crugroup.com.

    Lead times extend as HR passes 10 weeks, plate sets another record

    US sheet and plate buyers face longer waits amid historically constrained US steel supply, according to the latest SMU steel market survey data. Average lead times now nearly reach mid-February, with some mills not quoting availability until March or later. For most sheet products—except Galvalume—buyers haven’t faced waits this long since the post-pandemic rebound in 2021. Plate has gone further, surpassing its 2021 peak and repeatedly reaching new highs over the past month. SMU’s plate data stretch back to 2018, and our sheet data to 2012.

    SMU Price Ranges move upward as record-breaking rally continues

    Sheet and plate prices continued a rally that has broken records in terms of duration if not (yet) in terms of pricing. Spot availability, meanwhile, remained extremely limited – and could stay that way well into the first quarter, market participants said. Some sources said certain mills haven’t opened January books and might not have any spot tons available until February. Others said they didn’t think they’d be able to get spot material until March.

    HRC vs. busheling spread – What a difference a year makes

    The US scrap market is in a very different position in 2026 than in 2025. This year has seen a dramatic rise in the price and demand for hot-rolled coil (HRC), while scrap prices lagged until very recently. Many project HRC prices to keep rising, and scrap prices are also expected to increase, not only seasonally but because of supply and demand pressure. Still, let’s take a look at the comparative numbers in 2026 vs. last year.